Middlemore Hospital – Adult Medical Centre Entrance

  • -

Middlemore Hospital – Adult Medical Centre Entrance

 

Flooring Project Description: Refurbishment of vinyl flooring at main hospital entrance and reception

Client: Counties Manukau District Health Board

Value: $100k

Dates: August to November 2014

 Middlemore 3 ws Middlemore 4 ws

 

Work Completed:

  • Uplift existing vinyl
  • Diamond grind floor to remove old adhesive and preparation compound
  • Epoxy prime and fill cracks
  • Prime and apply Ardex MC Rapid Moisture Control System
  • Prepare floors using Ardex K12 self-levelling compound
  • Supply and fix Tarkett vinyl floor covering.

 

Flooring Project Highlights

 

Live Hospital Environment
This work was completed without closure of the entrance – a challenging job given the amount of foot traffic each day
We worked out an elaborate around-the-clock schedule with the hospital staff, enabling us to work our way through the whole area in stages and get the job done on time.
Grinding was performed behind portable timber barriers to ensure the area remained safe for the public, staff and patients.
Quality
Our rigorous checks during the floor preparation stage identified a moisture issue and major cracking under the old flooring.
Using a combination of techniques including a new moisture control system, we were able to rectify the issue for the client to ensure a finished product that will last.

 

“A series of planned stages was worked out between the hospital and Hills to ensure a top quality result was achieved.

Howard and his team worked night and day to execute the project of which I can say the end result looks excellent and we expect to get a long and serviceable life from the new vinyl.”

– Nathan Linton, Project Engineer, Counties Manukau District Health Board