Christchurch Hospital – CHOC

 

Hills Commercial Floors recently completed work at Christchurch Hospital, providing a flooring solution for the new, custom-built Children’s Haematology Oncology Centre.

The following clip from Campbell Live about the new centre features some of the young patients dancing and playing on our finished flooring.

All of the floors seen in the clip were our work.

 

CHOC corridor 2 wsFlooring Project Description: Flooring installation for the new Children’s Haematology Oncology Centre

Client: Corbel Construction

Value: $335k

Dates: October to December 2014

Work Completed:

  • Supply of 14 different colours of vinyl – specially imported for the project
  • Installation of 1,150m2 of floor vinyl
  • Installation of 1,550m2 of wall vinyl
  • Installation of 350m2 of carpet tiles

 

Flooring Project Highlights

 

Robust Management Oversight
Hills Commercial Floors’ management made daily visits to the worksite to oversee quality, progress against targets, and communication with the client. 
Client Satisfaction
The client was so happy with our quality, timeliness and communication that we received additional work. This was undertaken between December 2014 and April 2015.
Health and Safety
Not a single health and safety incident was reported throughout the project duration.

 

 


  • -

Middlemore Hospital – Adult Medical Centre Entrance

 

Flooring Project Description: Refurbishment of vinyl flooring at main hospital entrance and reception

Client: Counties Manukau District Health Board

Value: $100k

Dates: August to November 2014

 Middlemore 3 ws Middlemore 4 ws

 

Work Completed:

  • Uplift existing vinyl
  • Diamond grind floor to remove old adhesive and preparation compound
  • Epoxy prime and fill cracks
  • Prime and apply Ardex MC Rapid Moisture Control System
  • Prepare floors using Ardex K12 self-levelling compound
  • Supply and fix Tarkett vinyl floor covering.

 

Flooring Project Highlights

 

Live Hospital Environment
This work was completed without closure of the entrance – a challenging job given the amount of foot traffic each day
We worked out an elaborate around-the-clock schedule with the hospital staff, enabling us to work our way through the whole area in stages and get the job done on time.
Grinding was performed behind portable timber barriers to ensure the area remained safe for the public, staff and patients.
Quality
Our rigorous checks during the floor preparation stage identified a moisture issue and major cracking under the old flooring.
Using a combination of techniques including a new moisture control system, we were able to rectify the issue for the client to ensure a finished product that will last.

 

“A series of planned stages was worked out between the hospital and Hills to ensure a top quality result was achieved.

Howard and his team worked night and day to execute the project of which I can say the end result looks excellent and we expect to get a long and serviceable life from the new vinyl.”

– Nathan Linton, Project Engineer, Counties Manukau District Health Board